Garden-fresh finds · Free shipping over $65 · Browse the beds

06-22: David Spacek, Westar Energy, Inc. Fills Based on the test information

SKU: 36017947144

4.8
USD20.00 USD51.00

Pay in 4 interest-free payments of $5.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 8 - Aug 13

Description

Based on the test information on the current condition and the original design stresses

redwood splash fill tower were selected to install and test PVC-V-Bar fill

Using the results of the IPP investigation guidelines were generated for the seismic evaluation of spaced tile fill in cooling tower located in both the eastern and western United States

the spray system is off

or experience data

06-22: David Spacek, Westar Energy, Inc. Fills Based on the test informationChanges to national building codes and state building codes in California and Florida have given rise to special requirements for cooling towers to be able to withstand windload and seismic forces.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products